docs(fase-6): propuesta — deploy readiness (PWA + rate-limit + JWT rotation)
New plan file closing out the Fase 4 deferrals with specifics confirmed
by user on 2026-04-14:
- 6.1 PWA injectManifest, MINIMAL scope (precache shell only; Supabase
GETs stay network-only since $lib/sync + SyncBanner already cover
offline writes + the offline indicator)
- 6.2 manifest.webmanifest + neutral placeholder icons (192/512/180 +
maskable 512) + iOS meta tags
- 6.3 Kong rate-limiting — 10/min + 60/hour on /auth/v1/token per IP,
30/min on /auth/v1/authorize per IP, 20/hour on invitations POST
per authenticated user
- 6.4 JWT rotation — dev rotate now + .env.production.example template
+ infra/scripts/rotate-jwt.sh
- 6.5 Lighthouse PWA ≥ 90 + scripted rls-audit.sh (curl edition of
Vitest's rls-audit.test.ts)
- 6.Z verification
Explicitly out of scope (recorded at bottom of the plan):
- Push notifications (no current use case)
- Ephemeral-Docker CI (deferred)
- Runtime caching of Supabase in the SW (deferred)
- Final production icon art (placeholders land now; real art before
public launch)
README phase table + index updated; plan total now 11–16 weeks.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
This commit is contained in:
@@ -16,6 +16,7 @@
|
||||
| Fase 3 — Tareas y Notas | ✅ Completa |
|
||||
| Fase 4 — Búsqueda y Pulido | 🟡 Búsqueda + RLS audit completos; PWA install/push/rate-limit/JWT rotation diferidos a sprint de deploy |
|
||||
| Fase 5 — Rediseño UX Mobile | ✅ Completa en scope automatizable (shell + masthead + big-button create + row redesign + selection mode + sticky detail chrome); presence avatars en cards + M-swipe/SEL-long-press touch E2E diferidos a WebKit install |
|
||||
| Fase 6 — Deploy readiness | ⏳ Propuesta (PWA injectManifest + manifest + iconos placeholder + Kong rate-limit + rotación JWT + Lighthouse audit). Push notifications retiradas del scope. |
|
||||
| Suite de tests (pgTAP + Vitest + Playwright) | ✅ 233 tests verdes (34 pgTAP + 140 integración + 15 unit + 44 E2E), 2 skipped, ejecutables con `just test-all` |
|
||||
|
||||
---
|
||||
@@ -41,8 +42,9 @@ Las fases ya cerradas (0, 1, 2a) reflejan este patrón retroactivamente: la secc
|
||||
| Fase 3 | [fase-3-tareas-notas.md](plan/fase-3-tareas-notas.md) | 1–2 semanas |
|
||||
| Fase 4 | [fase-4-busqueda-pulido.md](plan/fase-4-busqueda-pulido.md) | 1 semana |
|
||||
| Fase 5 | [fase-5-mobile-ux.md](plan/fase-5-mobile-ux.md) | 1–2 semanas |
|
||||
| Fase 6 | [fase-6-deploy-prep.md](plan/fase-6-deploy-prep.md) | 3–5 días |
|
||||
|
||||
**Total estimado: 10–15 semanas (con Fase 5 mobile)**
|
||||
**Total estimado: 11–16 semanas (con Fase 6 deploy prep)**
|
||||
|
||||
Los mockups de referencia viven en [`design/`](design/) (organizados por pantalla — ver `design/slate_collective/DESIGN.md` para la dirección "Monolith Editorial").
|
||||
|
||||
|
||||