docs(plan): brand fases 9–14 as MVP2
Stamps the six planned post-MVP fases as the MVP2 cycle (matching the `mvp2` branch name). Each plan file gets an "MVP2 · N/6" header. README status + index tables group them under an MVP2 bracket. CLAUDE.md project status reframes the planned line as MVP2 and clarifies that Fase 7+8 shipped as MVP cleanup, not MVP2. Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
This commit is contained in:
@@ -1,5 +1,7 @@
|
||||
### Fase 10 — Spec completion ("cerrar la laguna del `analisis-funcional`")
|
||||
|
||||
**MVP2 · 2/6.** Segunda fase del ciclo MVP2 (rama `mvp2`, fases 9 → 14).
|
||||
|
||||
**Estado: 📋 Planificada. Cubre las 8 piezas de "completion debt" detectadas en el audit del 2026-04-22: 3 CU de gestión de colectivo (H06/H07/H08), 3 afordances de contenido ya construido (trash restore, reset-from-detail, sidebar create-collective), eliminación de cuenta, y detección automática de idioma.**
|
||||
|
||||
**Objetivo: llevar la paridad con `analysis/analisis-funcional.md` al 100% en el eje de gestión de colectivo y ciclo de vida de usuario/contenido — todo lo que los usuarios empiezan a pedir desde el primer día de uso real.**
|
||||
|
||||
Reference in New Issue
Block a user