docs(fase-5): plan mobile UX rewrite ("Monolith Editorial")
- Add plan/fase-5-mobile-ux.md with 7-chunk breakdown:
5.0 mobile tests (Playwright mobile-shell/masthead/swipe-delete + Vitest helpers)
5.1 responsive shell (MobileTopBar + BottomTabBar + MobileDrawer)
5.2 ScreenMasthead + px-4/md:px-6 pass
5.3 /lists mobile cards
5.4 /lists/[id] rows + red-zone swipe-delete
5.5 undoQueue store + UndoToast
5.6 scrollable frequency chips
5.7 tasks/notes/search shell + masthead
5.Z verify 211 + new M-series green
- Explicit gap analysis vs. current app + deliberate exclusions
(no priority badges, no voice search, no fake meta like "Dairy · Weekly")
- Index design/ directory: Stitch mockups per screen (mobile + desktop variants),
plus the "Monolith Editorial" DESIGN.md directing tonal shifts, masthead
typography, glassmorphism, and the no-line rule
- Relocate DESIGN.md under design/slate_collective/DESIGN.md (old entry point) —
the current design direction lives at design/DESIGN.md
- Reference design/ from CLAUDE.md + add Fase 5 to README phase index
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
This commit is contained in:
@@ -15,6 +15,7 @@
|
||||
| Fase 2b — Realtime y Modo Compra | ✅ Completa (presence bloqueado por bug upstream de `supabase/realtime`) |
|
||||
| Fase 3 — Tareas y Notas | ✅ Completa |
|
||||
| Fase 4 — Búsqueda y Pulido | 🟡 Búsqueda + RLS audit completos; PWA install/push/rate-limit/JWT rotation diferidos a sprint de deploy |
|
||||
| Fase 5 — Rediseño UX Mobile | ⏳ Plan propuesto ("Monolith Editorial") — pendiente de implementación |
|
||||
| Suite de tests (pgTAP + Vitest + Playwright) | ✅ 211 tests verdes (34 pgTAP + 140 integración + 6 unit + 31 E2E), ejecutables con `just test-all` |
|
||||
|
||||
---
|
||||
@@ -39,8 +40,11 @@ Las fases ya cerradas (0, 1, 2a) reflejan este patrón retroactivamente: la secc
|
||||
| Fase 2b | [fase-2b-realtime-modo-compra.md](plan/fase-2b-realtime-modo-compra.md) | 2–3 semanas |
|
||||
| Fase 3 | [fase-3-tareas-notas.md](plan/fase-3-tareas-notas.md) | 1–2 semanas |
|
||||
| Fase 4 | [fase-4-busqueda-pulido.md](plan/fase-4-busqueda-pulido.md) | 1 semana |
|
||||
| Fase 5 | [fase-5-mobile-ux.md](plan/fase-5-mobile-ux.md) | 1–2 semanas |
|
||||
|
||||
**Total estimado: 9–13 semanas**
|
||||
**Total estimado: 10–15 semanas (con Fase 5 mobile)**
|
||||
|
||||
Los mockups de referencia viven en [`design/`](design/) (organizados por pantalla — ver `design/DESIGN.md` para la dirección "Monolith Editorial").
|
||||
|
||||
---
|
||||
|
||||
|
||||
Reference in New Issue
Block a user