Records the closing state of Fase 10: spec coverage now 100% on the
H-series CUs, full FK on-delete audit table, 5 architectural decisions
(Keycloak not cleaned up on account delete, sole-member must dissolve,
type-the-name dissolve confirmation, client-side language detection,
trash via RPC). Bumps the MVP2 progress to 2/6 and the test totals
to 360 active + 3 skipped.
Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
Stamps the six planned post-MVP fases as the MVP2 cycle (matching the
`mvp2` branch name). Each plan file gets an "MVP2 · N/6" header. README
status + index tables group them under an MVP2 bracket. CLAUDE.md project
status reframes the planned line as MVP2 and clarifies that Fase 7+8
shipped as MVP cleanup, not MVP2.
Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
Fase 9 bundles dark mode as the flagship feature plus the four polish items
parked from Fase 5/6 (sync_conflicts wiring, presence avatars still blocked
on supabase/realtime #1617). Fase 10 closes the completion debt found in the
2026-04-22 audit: CU-H06/H07/H08 (leave/dissolve/transfer admin), trash
restore, reset-from-detail, sidebar create-collective, account deletion, and
automatic language detection.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>