Commit Graph

3 Commits

Author SHA1 Message Date
6cb13146f5 docs(fase-9): history doc + CLAUDE.md status + plan closed
- docs/history/fase-9-polish-dark-mode.md captures the final palette
  (hex + contrast ratios), the four sub-fases (dark mode / reading
  width / sync_conflicts / WebKit specs), the test-count delta
  (259 → 300 + 3 skipped, +41 specs), the upstream-bug audit for
  Realtime presence (#1617 still open as of 2026-05-18, latest stable
  v2.86.3), and the prod-migration note (existing sessions do not
  need a re-login because users.theme is queried, not in the JWT).
- CLAUDE.md project-status line flips Fase 9 to complete, bumps the
  test totals to 300 green / 3 skipped, and adds a new "Testing"
  gotcha for the WebKit project gate (RUN_WEBKIT=1 + libicu74 deps).
- plan/fase-9 marks the phase  with a one-liner about new test counts.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-18 01:53:02 +02:00
93153cd750 docs(plan): brand fases 9–14 as MVP2
Stamps the six planned post-MVP fases as the MVP2 cycle (matching the
`mvp2` branch name). Each plan file gets an "MVP2 · N/6" header. README
status + index tables group them under an MVP2 bracket. CLAUDE.md project
status reframes the planned line as MVP2 and clarifies that Fase 7+8
shipped as MVP cleanup, not MVP2.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-18 00:42:08 +02:00
0e4ada0083 docs(plan): fase-9 (polish + dark mode) and fase-10 (spec completion)
Fase 9 bundles dark mode as the flagship feature plus the four polish items
parked from Fase 5/6 (sync_conflicts wiring, presence avatars still blocked
on supabase/realtime #1617). Fase 10 closes the completion debt found in the
2026-04-22 audit: CU-H06/H07/H08 (leave/dissolve/transfer admin), trash
restore, reset-from-detail, sidebar create-collective, account deletion, and
automatic language detection.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-23 18:54:26 +02:00