b994fc7c95 docs(plan): add Fase 15 — common items management (MVP2 reopened to 7 fases)
Adds a planned-phase doc for the next ask on top of the closed MVP2 cycle:
weighted suggestion ordering + exclude items already on the active list.

- Extends item_frequency (migration 026) with `weight integer` written via
  two admin-only SECURITY DEFINER RPCs (set_item_frequency_weight +
  purge_item_frequency). The client never writes weight directly — the
  existing all-deny policies on item_frequency stay in place.
- fetchSuggestions reorders by `weight desc, use_count desc, last_used_at
  desc` and accepts an excludeNames arg to drop already-added items from
  the dropdown.
- UI lives in /collective/manage as a 3-way segmented control per row
  (Hide / Normal / Boost mapping to -50 / 0 / 50). Admin writes; member
  read-only; guest hidden.

Rebrand: MVP2 reopens from 6/6  to in-progress 6/7 , with Fase 15
pending. Headers in fases 9–14 bump from "·N/6" + "fases 9 → 14" to
"·N/7" + "fases 9 → 15". README status table + index updated, CLAUDE.md
project status appends the Fase 15 pending paragraph.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-18 11:08:00 +02:00
a868b5a314 docs(fase-10): history doc + CLAUDE.md status + plan closed
Records the closing state of Fase 10: spec coverage now 100% on the
H-series CUs, full FK on-delete audit table, 5 architectural decisions
(Keycloak not cleaned up on account delete, sole-member must dissolve,
type-the-name dissolve confirmation, client-side language detection,
trash via RPC). Bumps the MVP2 progress to 2/6 and the test totals
to 360 active + 3 skipped.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-18 02:43:29 +02:00
93153cd750 docs(plan): brand fases 9–14 as MVP2
Stamps the six planned post-MVP fases as the MVP2 cycle (matching the
`mvp2` branch name). Each plan file gets an "MVP2 · N/6" header. README
status + index tables group them under an MVP2 bracket. CLAUDE.md project
status reframes the planned line as MVP2 and clarifies that Fase 7+8
shipped as MVP cleanup, not MVP2.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-18 00:42:08 +02:00
0e4ada0083 docs(plan): fase-9 (polish + dark mode) and fase-10 (spec completion)
Fase 9 bundles dark mode as the flagship feature plus the four polish items
parked from Fase 5/6 (sync_conflicts wiring, presence avatars still blocked
on supabase/realtime #1617). Fase 10 closes the completion debt found in the
2026-04-22 audit: CU-H06/H07/H08 (leave/dissolve/transfer admin), trash
restore, reset-from-detail, sidebar create-collective, account deletion, and
automatic language detection.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-23 18:54:26 +02:00