93153cd750 docs(plan): brand fases 9–14 as MVP2
Stamps the six planned post-MVP fases as the MVP2 cycle (matching the
`mvp2` branch name). Each plan file gets an "MVP2 · N/6" header. README
status + index tables group them under an MVP2 bracket. CLAUDE.md project
status reframes the planned line as MVP2 and clarifies that Fase 7+8
shipped as MVP cleanup, not MVP2.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-18 00:42:08 +02:00
0e4ada0083 docs(plan): fase-9 (polish + dark mode) and fase-10 (spec completion)
Fase 9 bundles dark mode as the flagship feature plus the four polish items
parked from Fase 5/6 (sync_conflicts wiring, presence avatars still blocked
on supabase/realtime #1617). Fase 10 closes the completion debt found in the
2026-04-22 audit: CU-H06/H07/H08 (leave/dissolve/transfer admin), trash
restore, reset-from-detail, sidebar create-collective, account deletion, and
automatic language detection.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-23 18:54:26 +02:00